To give the platform traction on the steep roof we attached two strips of self adhesive weatherstrip to the underside.
Suspend the roof from the wall.
While i don t doubt that it can handle the weight since the they are foam panels with sheet metal approx.
Add an additional 2 inches to this measurement if you plan to use panel.
Attach the corner molding to the wall along the perimeter mark securing the molding to the wall studs.
Roof trusses support a roof s weight by transferring the weight load downward and outward to the building s bearing walls.
2 5 psf however i just can t call it out on the plans without understanding the structural system of the wooden roof trusses above and verifying the loads it originally.
Mark the locations of the wall studs using a stud finder.
Measure down 4 inches from the bottom of the lowest beam piece of ductwork pipe or conduit in your ceiling space.
Use a carpenter s level to transfer the mark around the perimeter of the room following the track plan.
The load is transferred from the wall area by beam function to suspended floor and roof area ceiling area.
This configuration maintains proper clearance between the suspended work platform and the façade.
To suspend a chandelier from the ceiling.
A 1x4 cut to the appropriate length should fit snugly behind that top edge on most cabinets.
If you don t have room for a wall hanger suspend the kayak from the ceiling instead.
Davits were installed to avoid loading the cornice.
Measure and mark the location on the wall for the first plywood section.
The davit arm in the foreground can be moved to any davit pedestal base needed.
5 x 5 sleeves were cast into the cornice to allow a suspended cable to pass through.
8 screw to drill through the wooden wall mount bracket on the back of the cabinet and into the side of the new top mounted bracket.
We made ours of half inch plywood with a lip around the top.
The contractor is keep pushing to suspend from the trusses above.
Through the wind bracing of the roof area or the diaghragm function in the ceiling area the load is transferred to the gable areas that by wall function transfer the load to the foundations of the gables.
With this piece of wood flush against the back edge of the top of the cabinet use a no.
It will allow you to stand the kayak up in an out of the way spot.
They do this by means of top chords which are sloping members that extend from the peak of the roof to the top of the exterior walls at the eaves.
Create a triangular platform with an angle opposite the roof a bevel gauge and level will show you what the level needs to be.